首页--经济论文--经济计划与管理论文--企业经济论文--企业计划与经营决策论文

特灵公司全球性研发项目的管理

摘要第1-6页
Abstract第6-7页
1. Introduction第7页
2. Introduction of Trane第7-12页
   ·Company background第7-8页
   ·Trane history and development第8-10页
   ·Core competitiveness of Trane第10-12页
3. Literature review: benefits and challenges of global R&D第12-14页
4. Potential benefits and existing conditions of global design for Trane第14-20页
   ·Potential benefits of global design for Trane第14-15页
   ·Existing resources for global design for Trane第15-17页
     ·Developed organization第15-16页
   Fig 1: Matrix structural forms for global project in Trane Company第15-16页
     ·IT solution for global management第16-17页
     ·Portal Project workspace第17页
   ·NPI — Implement and process management of global design第17-20页
     ·Background of NPI第17页
     ·What is NPI第17-18页
     ·Background of NTI (New Technology Introduction)第18页
     ·What is NTI第18-19页
     ·NPI: roadmap, process and main stages第19页
  Fig 2: NPI: roadmap, process and main stages第19页
  Fig 3: NTI, NPI, and DFSS Concept Engineering Integration第19-20页
5. Study of a current global design project of Trane第20-31页
   ·RTWD global project background第20-21页
   ·VOC to CTQ process of RTWD第21-23页
     ·VOC (voice of customer) collection第21-22页
     ·VOC (voice of customer) data analysis and challenge第22-23页
   Fig 4: Customer CTQ summery第22-23页
     ·The main concern of VOC to CTQ process第23页
   ·Technical readiness and concept design phases第23-25页
     ·The main concern of engineer work in this phase第24页
     ·The main concern of designer work in this phase第24-25页
   ·Main concern in conception and verification phase第25-28页
     ·Inefficient communication of parallel effort in unit test & data analysis process第25-26页
     ·Inefficiency of trust issue in verification unit design phase第26-27页
     ·Challenge of job rotation第27-28页
   ·Achievement and issues of PLM system第28-29页
   ·Manufactory and sourcing issues in cost estimate and capacity input第29-31页
     ·Absent or inaccurate data input is high risk in cost estimate第29-30页
     ·Lack of capacity input and review participation from manufacture result in redesign第30页
     ·Global sourcing is far away from global project第30-31页
6. Analysis of main issues of RTWD project by using 7S model第31-39页
   ·The first "S": strategy第31-32页
   ·The second "S": structure第32-34页
     ·Resource lack in manufacture, sourcing and IT group assigned on RTWD第32页
     ·Methodology of resource restriction management第32-33页
     ·Proposal of resource management in matrix structure第33-34页
   ·The third "S": system第34-35页
   ·The fourth "S": staffing第35-36页
   ·The fifth "S": skills第36-37页
   ·The sixth "S": style第37-39页
   ·The seventh "S": shared values第39页
7. Conclusion and recommandation第39-41页
Appendix: questionnaires第41-42页
List of references第42-44页

论文共44页,点击 下载论文
上一篇:可满着色图和最优标号问题