摘要 | 第4-5页 |
Abstract | 第5-6页 |
1 Introduction | 第11-24页 |
1.1 Preface | 第11-12页 |
1.2 Study background and research significance | 第12-18页 |
1.2.1 Repairable systems definition | 第13-14页 |
1.2.2 System maintenance with renewable theory | 第14-15页 |
1.2.3 Classification of measures to the availability system | 第15-18页 |
1.3 Motivation and problem statement | 第18-19页 |
1.4 Objectives of the studies | 第19-20页 |
1.5 Organisation of the Thesis | 第20-24页 |
2 Literature Review | 第24-33页 |
2.1 Interpretation of maintainability, reliability, and availability of repairable system | 第24-26页 |
2.2 Study to the availability system | 第26-31页 |
2.2.1 Models formulation for unavailability as well as availability system | 第28-30页 |
2.2.2 Inspection interval time for maximizing the system availability | 第30-31页 |
2.3 Additional study on inspection interval time of availability system | 第31-33页 |
3 Computation of instant system availability and its applications | 第33-54页 |
3.1 Starting point monotonicity analysis | 第35-42页 |
3.2 Bounded for availability system | 第42-43页 |
3.3 Comparison of availability system | 第43-47页 |
3.4 Numerical examples for clarification | 第47-48页 |
3.5 Application to bathtub | 第48-52页 |
3.6 Concluding remarks | 第52-54页 |
4 Technical application for inspection sampling for repairable systems in an economicsystem | 第54-77页 |
4.1 A note on assumptions | 第56-60页 |
4.2 Repairable system introduction | 第60-65页 |
4.3 Main Proofs | 第65-69页 |
4.4 Numerical examples for clarification | 第69-73页 |
4.5 Application to Burn-in | 第73-75页 |
4.6 Concluding remarks | 第75-77页 |
5 System availability of inspection constant to the dormant failures considering replacement or repair together with inspection downtime period | 第77-95页 |
5.1 Availability of the system under calendar based on the inspection procedure | 第79-84页 |
5.1.1 Formulation of the model using assumption A_0 | 第79-81页 |
5.1.2 Formulation of the model using assumption A_1 | 第81-84页 |
5.2 Availability system and age based on the inspection procedure | 第84-89页 |
5.2.1 Formulation of the model using the assumption A_0 | 第85-86页 |
5.2.2 Formulation of the model using the assumption A_1 | 第86-89页 |
5.3 Results and discussions | 第89-90页 |
5.4 Numerical example for explanation | 第90-94页 |
5.5 Concluding Remarks | 第94-95页 |
6 Summary and Prospect | 第95-99页 |
6.1 Conclusion | 第95-96页 |
6.2 Abstract of Innovation Points | 第96-97页 |
6.3 Future Research | 第97-99页 |
References | 第99-109页 |
Published Academic Articles during PhD Period | 第109-111页 |
Acknowledgement | 第111-112页 |
About the Author | 第112-114页 |