首页--工业技术论文--建筑科学论文--土力学、地基基础工程论文--地基基础论文--桩基及深基础论文--桩基论文

隧道掘进对群桩影响的三维数值分析

摘要第1-5页
Abstract第5-8页
1 Introduction第8-11页
   ·Background第8-9页
   ·Objectives第9-10页
   ·Main contents of research第10-11页
2 Background theory and literature review第11-25页
   ·Introduction第11页
   ·Tunneling induced ground movements第11-20页
   ·Influence of a tunnel excavation on pile第20-25页
3 Modeling of tunnel in stiff clay第25-32页
   ·Introduction第25-26页
   ·Finite Element Mesh第26-28页
   ·Initial and boundary conditions第28-29页
   ·Model parameters第29-31页
   ·Modeling Procedure第31-32页
4 Tunneling effect on existing pile group for case C/D =2.5第32-42页
   ·Introduction第32页
   ·Determination of the axial load carrying capacity of the pile group第32-33页
   ·Surface settlement第33-34页
   ·Pile group settlement and loss of capacity due to tunneling第34-36页
   ·Tilting of pile cap due to tunnel advancement第36页
   ·Load transfer within the pile group at various tunneling stages第36-38页
   ·Stress changes in the soil due to tunnel advancement第38-39页
   ·Tunneling-induced bending moment along piles第39-40页
   ·Generation of excessive pore water pressure due to tunneling第40-42页
5 Comparison of the results第42-54页
   ·Introduction第42页
   ·Surface settlement trough第42-43页
   ·Pile group settlement and loss of capacity due to tunneling第43-45页
   ·Tilting of pile cap due to tunnel advancement第45-47页
   ·Load transfer within the pile group at various tunneling stages第47-49页
   ·Stress changes in the soil due to tunnel advancement第49-50页
   ·Tunneling-induced bending moment along piles第50-52页
   ·Generation of excessive pore water pressure due to tunneling第52-54页
6 Conclusions and suggestions第54-56页
   ·Conclusions第54-55页
   ·Suggestions第55-56页
Acknowledgement第56-57页
References第57-60页

论文共60页,点击 下载论文
上一篇:软土路堤二维数值模拟研究
下一篇:FLNG系统转运卸载系泊特性研究