Planning Method of Construction Management Combining Critical Path Method and Lean Construction

Abstract第4页
摘要第5-6页
详细摘要第6-13页
Chapter 1 Introduction第13-28页
    1.1 Background第13-14页
    1.2 Purpose and Significance of the study第14-16页
    1.3 Analysis of literature review at home and abroad第16-25页
        1.3.1 Critical Path Method (CPM) Review第17-19页
        1.3.2 Lean Construction Management Review第19-24页
        1.3.3 Combining Critical Path Method and Lean Construction Review第24-25页
        1.3.4 Analysis of Research Status第25页
    1.4 Contents and Methodology of the Research第25-28页
        1.4.1 Research Content第25-26页
        1.4.2 Research Method第26-28页
Chapter 2 CPM and Lean Construction Theories Analysis第28-37页
    2.1 Critical Path Method第28-33页
        2.1.1 Definition and Importance of CPM第28-29页
        2.1.2 CPM as a General Method第29-30页
        2.1.3 CPM Analysis第30-33页
        2.1.4 CPM Limitations第33页
    2.2 Lean Construction Management第33-36页
        2.2.1 Definition – Lean Philosophy第33-34页
        2.2.2. Last Planner System第34页
        2.2.3 Lean Project Delivery System in Construction第34-35页
        2.2.4 Value Stream Mapping in Construction第35页
        2.2.5 Lean Construction Limitations第35-36页
    2.3 Summary第36-37页
Chapter 3 Planning Method of Preparing Construction Schedule Combining CPMand Lean Construction第37-50页
    3.1 The Beginning of a Plan of Construction Projects第37-42页
        3.1.1 Importance of Pre-Project第37-39页
        3.1.2 Customers’ impact on the Pre-Project and Final Project第39-41页
        3.1.3 Project Planning Combining CPM and Lean Construction第41-42页
    3.2 Planning Method Strategies and Ranges of Action第42-46页
        3.2.1 Work-flow Plan第42-45页
        3.2.2 Lean Thinking Leaders第45-46页
    3.3 Reducing Uncertainty of CPM in Construction Projects Applying LeanConstruction Philosophy第46-48页
        3.3.1 Integral Recognizing Activities Applying Lean Construction第46-47页
        3.3.2 Optimize and Insulate Critical Activities in Construction Projects第47页
        3.3.3 Actualize the Work Breakdown Structure using Value Stream Mapping第47-48页
    3.4 Supporting CPM diagram by identifying construction constrains第48-49页
    3.5 Summary第49-50页
Chapter 4 Planning Control at the Field第50-61页
    4.1 Planning Control Advising (Do it right from the first beginning)第50-52页
        4.1.1 Strategies to Follow the Plan at the Field and the Correct Applicabilityof the Method第50-52页
    4.2 Critical Network Project Plan: The Planning Method第52-58页
        4.2.1 Lean-Critical Planning第53-54页
        4.2.2 Lean-Critical Tracking and Control第54-58页
    4.3 Approach of Work Breakdown Structure (WBS) using Value StreamMapping (VSM)第58-60页
    4.4 Summary第60-61页
Chapter 5 Case Study第61-68页
    5.1 Case Study Methodology第61页
    5.2 Project Introduction第61-65页
        5.2.1 First Diagnostic: The Current Stage of the Project第61-63页
        5.2.2 Second Diagnostic of the Project: Results第63-65页
    5.3 Limitations of the Case Study第65-67页
    5.4 Conclusions and Contributions of the Case Study第67页
    5.5 Summary第67-68页
Conclusions第68-71页
References第71-77页
Acknowledgement第77-78页
Personal Resume第78页