摘要 | 第4-5页 |
Abstract | 第5-6页 |
目录 | 第7-9页 |
Chapter 1: Introduction | 第9-21页 |
1.1 General Introduction | 第9-10页 |
1.2 Problem Statement | 第10页 |
1.3 Basic Concepts and Background | 第10-16页 |
1.4 Literature Review | 第16-18页 |
1.5 Dissertation Methodology | 第18-19页 |
1.6 Organization of the Dissertation | 第19-21页 |
Chapter 2: The Main Technical Principles of Analysis on the Impact of Wind Farm Integratedinto Power System | 第21-45页 |
2.1 Introduction | 第21-23页 |
2.2 Network Integration Issues for Wind Power | 第23-24页 |
2.3 Modelling and Simulation of Wind Farm for Grid Power Studies | 第24-28页 |
2.4 Major Technical Calculations for the Wind farm connection to the Grid | 第28-37页 |
2.5 Protection Issues Considering Wind Farm Integration | 第37-41页 |
2.6 System operation status of DG | 第41-44页 |
2.7. Summary | 第44-45页 |
Chapter 3: Analysis of Voltage and Frequency Responses at PCC of Wind Farm and theResponses of Wind Turbines in View of Short-circuit Fault | 第45-65页 |
3.1 Introduction | 第45-46页 |
3.2 Power System Condition and Thermal Withstand Capacity | 第46-53页 |
3.3 Thevenin Equivalent Calculation Analysis for External Feeder Network to the Wind Farm | 第53页 |
3.4 Modeling of Wind Farm main Equipment | 第53-56页 |
3.5 Simulations Calculation for Windfarm at 33/11kV | 第56-60页 |
3.6 Short Circuit Analysis of OHL Fault | 第60-64页 |
3.7 Summary | 第64-65页 |
Chapter 4: Studies of Transient Voltage and Frequency Stability and Flicker Analysis for aTypical Wind Farm | 第65-84页 |
4.1 Introduction | 第65-66页 |
4.2 Approach of the Analysis | 第66页 |
4.3 Assumptions for Transient Simulation | 第66-67页 |
4.4 Connection of tion of the Wind Farm | 第67页 |
4.5 Modelling and Simulation | 第67-74页 |
4.6 Calculated Results | 第74-76页 |
4.7 Flicker Background | 第76-77页 |
4.8 Flicker Emission Analysis | 第77-83页 |
4.9 Summary | 第83-84页 |
Chapter 5: Inrush current Phenomenon of Wind Farm Transformer and the Effect on VoltageInterruption during Switching Operation | 第84-95页 |
5.1 Introduction | 第84-85页 |
5.2 Description of Transformer Equation during Inrush Current | 第85-87页 |
5.3 Modelling of wind Farm Transformers | 第87-89页 |
5.4 Simulation test Results of the transformer | 第89-92页 |
5.5 Simulation Results and Analysis | 第92-94页 |
5.6 Summary | 第94-95页 |
Chapter 6: Protection Coordination Studies Using Time- Current hybrid with Dynamic Analysisof the "Sequence of Operation" | 第95-113页 |
6.1 Introduction | 第95页 |
6.2 Wind Farm Topology | 第95-96页 |
6.3 Relay Configuration of Wind Farm and OHL | 第96-99页 |
6.4 Wind Farm Protection Method | 第99-101页 |
6.5 Setting Verification | 第101-112页 |
6.6 Summary | 第112-113页 |
Chapter 7: Conclusions and Future Work | 第113-116页 |
7.1 Conclusions | 第113-114页 |
7.2 Future Work | 第114-116页 |
Acknowledgement | 第116-118页 |
Publications | 第118-119页 |
References | 第119-128页 |
Appendix | 第128-151页 |