Abstract | 第4页 |
摘要 | 第6-13页 |
CHAPTER ONE:INTRODUCTION | 第13-17页 |
1.1 Background of the Subject | 第13页 |
1.2 Significance of The Subject | 第13-14页 |
1.3 Purpose of the Study | 第14页 |
1.4 Scope of the Study | 第14-15页 |
1.5 Research content and structure | 第15-17页 |
CHAPTER TWO:LITERATURE REVIEW | 第17-27页 |
2.1 Introduction | 第17-18页 |
2.2 Cost management | 第18-21页 |
2.3 Time management | 第21-24页 |
2.4 Quality management | 第24-27页 |
CHAPTER THREE:RESEARCH SURVEY AND INTRODUCTION AND PRESENTAION OFDHARAN WATER SUPPLY PROJECTS | 第27-61页 |
3.1 Goals and description of samples | 第27-32页 |
3.2 Summary of case studies | 第32页 |
3.3 Introduction and presentation of dharan water supply project | 第32-55页 |
3.3.1 Delineation of service area and population coverage | 第32-34页 |
3.3.2 Layout and engineering design | 第34-35页 |
3.3.3 Multiple distribution zones/dma | 第35-37页 |
3.3.4 Water source | 第37页 |
3.3.5 Water quality assessment | 第37-38页 |
3.3.6 Transmission mains / Pumping Mains | 第38-40页 |
3.3.7 Distribution reservoirs | 第40-41页 |
3.3.8 Distribution mains | 第41-42页 |
3.3.9 Bulk meters and other valve chambers | 第42页 |
3.3.10 Thrust blocks/anchor blocks | 第42-43页 |
3.3.11 River/Stream crossing | 第43-44页 |
3.3.12 House connections/shared taps | 第44-45页 |
3.3.13 Electromechanical components | 第45-50页 |
3.3.14 Other system appurtenances | 第50页 |
3.3.15 Road reinstatement works | 第50-51页 |
3.3.16 Project cost estimate | 第51-55页 |
3.4 Operation and management | 第55-61页 |
3.4.1 General | 第55-56页 |
3.4.2 Personnel Cost | 第56-57页 |
3.4.3 Maintenance cost | 第57页 |
3.4.4 Total operation and maintenance cost | 第57-58页 |
3.4.5 Operation by contractor | 第58-59页 |
3.4.6 Cost of operation by contractor | 第59-61页 |
CHAPTER FOUR: PROBLEMS ON DHARAN WATER SUPPLY PROJECTS | 第61-79页 |
4.1 Problems investigation by Comparing with other four related projects importance of factors ofvariance | 第61-69页 |
4.1.1 Problem investigated Comparing Dharan water supply project with Kathmandu water supplyproject as below | 第61-63页 |
4.1.2 Problem investigated Comparing Dharan water supply project with melamchi water supplyproject as below | 第63-65页 |
4.1.3 Problem investigated Comparing Dharan water supply project with BHakundebeshi watersupply project as below | 第65-67页 |
4.1.4 Problem investigated Comparing Dharan water supply project with Damak water supplyproject as below | 第67-69页 |
4.2 Problem investigation by Comparing research projects actual situation with expected plan | 第69-77页 |
4.2.1 Problem investigation of causing cost overrun in Dharan water supply project | 第74-76页 |
4.2.2 Problem investigation of causing time overrun in Dharan water supply project | 第76-77页 |
4.3 Summary of problem investigation by comparing other related projects and Dharan watersupply project actual situation with expected plan | 第77-79页 |
CHAPTER FIVE:PRESENTATION OF FACTORS CAUSING COST AND TIME OVERRUNAND THEIR RELATIVE IMPORTANCE | 第79-139页 |
5.1 Factors influencing cost overruns at researched project | 第79-90页 |
5.2 Factors influencing time overruns at construction projects | 第90-134页 |
5.3 Degree of agreement among the Owners, Contractors, and Consultants for time and costoverruns groups | 第134-139页 |
CHAPTER SIX:SUGGESTION AND COCLUSIONS | 第139-149页 |
6.1 Suggestion to Contractors | 第139-140页 |
6.2 Suggestion to Owner | 第140-141页 |
6.3 Suggestion to Consultants | 第141页 |
6.4 Suggestion to Government | 第141页 |
6.5 Conclusions | 第141-149页 |
REFERANCES | 第149-153页 |