尼泊尔水电项目成本超支与进度超期影响因素研究

摘要第4-7页
Abstract第7-9页
CHAPTER 1 INTRODUCTION第15-23页
    1.1 Background第15-17页
    1.2 Statement of the Problem第17-18页
    1.3 Purpose of the Study第18页
    1.4 Scope of the Study第18-19页
    1.5 Significance of the Study第19-20页
    1.6 Research Questions第20-21页
    1.7 Research Structure第21-23页
CHAPTER 2 LITERATUE REVIEW第23-35页
    2.1 Description of Run-of-the-River (ROR) Hydropower Project第23-29页
        2.1.1 Structure of Run-of-the-River (ROR) Hydropower Plant第23-26页
        2.1.2 Key Project Stakeholders第26-29页
    2.2 Previous Studies on Cost Escalation第29-32页
    2.3 Previous Studies on Schedule Overruns第32-35页
CHAPTER 3 RESEARCH SURVEY AND DATA ANALYSIS第35-57页
    3.1 Description of the samples第35-39页
    3.2 Research Deslign第39-43页
        3.2.1 Data Collection Methods第40-43页
    3.3 Cost Management第43-49页
        3.3.1 Analysis of Cost Variance第43-44页
        3.3.2 Calculation of Cost Variance第44-48页
        3.3.3 Factors of Cost Variance第48-49页
    3.4 Schedule Managem Aent第49-57页
        3.4.1 Analysis of Schedule Variance第49-50页
        3.4.2 Calculation of Schedule Variance第50-54页
        3.4.3 Factors of Schedule Variance第54-57页
CHAPTER 4 FACTORS CAUSING COST ESCALATION AND THEIR RELATIVEIMPORTANCE第57-79页
    4.1 Analysis of Importance of Factors causing Cost Escalatio第57-58页
    4.2 Presentation of Factors Causing Cost Escalation and their Relative Importance第58-69页
    4.3 Analysis of Relative Importance of Categories of Factors of Cost Escalation, usingAnalytic Hierarchy Process (AHP) Model第69-79页
        4.3.1 Application of Analytic Hierarchy Process (AHP) Model to determine RelativeImportance of Factor Categories in causing Cost Escalation第72-79页
CHAPTER 5 FACTORS CAUSING SCHEDULE OVERRUN AND THEIR RELATIVEIMPORTANCE第79-98页
    5.1 Presentation of Factors causing Schedule Overruns and their Relative Importance第79-91页
    5.2 Application of Analytic Hierarchy Process (AHP) Model to determine RelativeImportance of Factor Categories in causing Schedule Overrun第91-98页
        5.2.1 Analysis of Factor Categories on the basis of criteria of Severity of Impact usingAHP Model第91-92页
        5.2.2 Analysis of Factor Categories on the basis of Frequency of Occurrence using AHPModel第92-93页
        5.2.3 Analysis of Factor Categories combining the criteria of Severity of Impact andFrequency of Occurrence using AHP Model第93-98页
CHAPTER6 CONCLUSION RECOMMENDATIONS AND LIMITATIONS第98-106页
    6.1 Conclusion第98-99页
    6.2 Recommendations第99-103页
        6.2.1 Recommendations for Cost Escalation第99-101页
        6.2.2 Recommendations for Schedule Overrun第101-103页
    6.3 Limitations of the Study第103-106页
BIBLIOGRAPHY第106-110页
附录第110-128页

论文共128页,点击 下载论文