首页--工业技术论文--建筑科学论文--建筑施工论文--施工管理论文

Fuzzy Analytical Hierarchy Process(FAHP) Approach to Risk Assessment in Ethiopian Building Construction Projects

Abbreviations第8-10页
Acknowledgements第10-11页
Abstract第11页
1. INTRODUCTION第12-17页
    1.1 Background第12-13页
    1.2 Statement of Problem第13-14页
    1.3 Significance of the Study第14-15页
    1.4 Objectives of the Study第15-16页
    1.5 Scope of the Study第16-17页
2. LITERATURE REVIEW第17-33页
    2.1 Review on Project Risk第17-21页
        2.1.1 Risk management第18-21页
        2.1.2 Risk assessment第21页
    2.2 Construction Projects第21-23页
    2.3 Construction Project Risk Factors第23-27页
    2.4 Fuzzy Analytic Hierarchy Process (FAHP)第27-32页
        2.4.1 Analytical hierarchy process (AHP)第27-29页
        2.4.2 Fuzzy logic第29-32页
    2.5 Summary of the Literature Review第32-33页
3 RESEARCH DESIGN AND METHODOLOGY第33-42页
    3.1 Research Design第33-36页
        3.1.1 Study area第33-34页
        3.1.2 Research approach第34-35页
        3.1.3 Data types and sources第35页
        3.1.4 Participant experts' profile第35-36页
    3.2 FAHP Risk Assessment Method第36-42页
4. APPLICATION OF "FAHP" IN ETHIOPIAN BUILDING CONSTRUCTIONPROJECTS第42-69页
    4.1 Risk Assessment Group第42页
    4.2 Identification of Project Risk Factors第42-48页
    4.3 Hierarchal Structures of Project Risk Factors第48-50页
    4.4 Linguistic Scale and Fuzzy Membership第50页
    4.5 Pairwise Comparisons第50-51页
    4.6 Aggregation of Fuzzy Numbers第51-55页
    4.7 Defuzzification of Fuzzy Numbers and Matrix Consistency第55-63页
    4.8 Project Risk Factors' Weight and Ranking第63-67页
    4.9 Summary of Building Construction Project Risk Factors第67-69页
5. RESULT AND D ISCUSSION第69-79页
    5.1 Critical Project Risk Factors Evaluation第69-72页
    5.2 Major Management Risk Factors and their Impact第72-75页
    5.3 Major Financial Risk Factors and their Impact第75-77页
    5.4 Major Contract and Legal Risk Factors and their Impact第77-79页
6. CONCLUSION AND RECOMMENDATIONS第79-81页
    6.1 Conclusion第79-80页
    6.2 Recommendations第80-81页
7. REFERENCES第81-87页
8. APPENDIXES第87-105页
    8.1 Appendix A第87-94页
    8.2 Appendix B第94-105页
学位论文评阅及答辩情况表第105页

论文共105页,点击 下载论文
上一篇:Impact of Establishing Kibungo Hospital in Rwanda from Project Perspectives
下一篇:企业并购中的对赌协议应用研究--以掌趣科技并购上游信息为例